Tuesday , April 23 2024

A Framework for Improving Planning-Scheduling Collaboration in Industrial Production Environment

Pedro GÓMEZ-GASQUET
Centro de Investigacion de Gestion e Ingenieria de la Produccion, Universidat Politecnica de Valencia, Cno. de Vera s/n,
Valencia, 46022, Spain

Francisco-Cruz LARIO
Centro de Investigacion de Gestion e Ingenieria de la Produccion, Universidat Politecnica de Valencia, Cno. de Vera s/n,
Valencia, 46022, Spain

Ruben-Dario FRANCO
Centro de Investigacion de Gestion e Ingenieria de la Produccion, Universidat Politecnica de Valencia, Cno. de Vera s/n,
Valencia, 46022, Spain

Víctor ANAYA-FONS
Centro de Investigacion de Gestion e Ingenieria de la Produccion, Universidat Politecnica de Valencia, Cno. de Vera s/n,
Valencia, 46022, Spain

Abstract: The work presented in this paper highlights how a real scheduling problem can be considered as a process avoiding the traditional operation research-based approach. Understanding the scheduling problem as a dynamic, uncertain and continuous process, in order to reduce the gap between reality and academic models, new conceptual elements emerge. The framework includes methodologies, concepts, architecture, and algorithms, which are based on the idea of a multiagent system in which planning-scheduling relationship is the core proposal. From the framework a software platform has been developed and tested in real industry.

Keywords: Planning-Scheduling collaboration, Framework, Multiagent.

>>Full text
CITE THIS PAPER AS:
Pedro GÓMEZ-GASQUET, Francisco-Cruz LARIO, Ruben-Dario FRANCO, Victor ANAYA-FONS, A Framework for Improving Planning-Scheduling Collaboration in Industrial Production Environment, Studies in Informatics and Control, ISSN 1220-1766, vol. 20 (1), pp. 67-78, 2011. https://doi.org/10.24846/v20i1y201106