In this paper the authors are interested in passive robustness of manufacturing job-shops with time constraints and particularly in the passive robustness facing advance time disturbances. The operation times are included between a minimum and a maximum value. P-time Petri nets are used for modeling. An algorithm allowing the computation of an advance passive robustness margin is elaborated relying on a study of the available local robustness at the synchronisation transition of a mono-synchronized subpath. Moreover, a lemma is stated regarding constraints violation where the margin is calculated. The occurrence of a time disturbance respecting both the lemma conditions and the algorithm margin does not involve any constraints violation. The established results are illustrated step by step on examples of a given workshop.
P-time Petri net, Passive robustness, Time disturbance, Time constraints, Manufacturing.
Nabil JERBI, Simon COLLART-DUTILLEUL, "Passive Robustness Computation Algorithm for Advance Time Disturbances in Manufacturing Job-shops", Studies in Informatics and Control, ISSN 1220-1766, vol. 27(1), pp. 25-32, 2018. https://doi.org/10.24846/v27i1y201803